News

From Baltic to Vietnam

DAKO Worldwide Transport most recently organized shipment of 6 Transformers and accessories with weights up to 263 tons each from St. Petersburg to Ho Chi Minh Port. All Cargo was safely loaded in time and on Budget on MV PAULA which is now underway towards Destination.

read more

Off we go

DAKO Worldwide most recently arranged a full charter of mining equipment with destination Port of Kamsar in Guinea. The 4500 FRT with pieces up to 560 cm in height were successfully loaded in Antwerp and Vigo for a fast journey to it’s final destinaton in West Africa.

read more

From ocean to air

After 6203 miles, the last shipment of in total more than 11.500 frt of wind energy equipment arrived safely in the port of Pisco, Peru.

read more

Just around the corner

This 58m long giant makes his way to the jobsite in southern Texas. With over 300 tons the heaviest piece out of this  shipment of in total more than 11.000 FRT which have been delivered safely.

read more

High and heavy

230 tons with a height of 19,15m hooked on for loading onto AAL Melbourne in China for quick transfer into the Gulf of Mexico.

read more

Size does matter

More than 11.000 FRT incl. Heavy Lift Pieces up to 340 tons of weight and over 19m in height are loaded in China and are now on their way towards the Golf of Mexico. Stay tuned for an update from us with pictures from the on-carriage to the final jobsite in Texas.

read more