Cement Plant for Russia

DAKO WORLDWIDE TRANSPORT GMBH - in cooperation with DAKOTRANS St. Petersburg / Moscow - executed a transport of 12.000 frt of equipment for cement plants with unit weights of 127 tons. This equipment was delivered on basis DDU Chelyabinsk in the Ural region. General cargo was transported by direct trucks from various places of origin in Europe, whereas the heavy and bulky machinery parts were transported from their origin by barge to the port of loading (Antwerp and Marseille). From there by sea river vessel to a port on the Wolga, reloaded there by a stationary heavy duty crane onto hydraulic trailers on barges and then via river transport to a ro/ro jetty, not far from Perm. The last stretch of transportation through the partly hilly Ural area was done by hydraulic heavy duty transport equipment. Transport execution was done in 2010.