Air Separation Plant for USA

DAKO WORLDWIDE TRANSPORT GMBH recently executed the transport of in total over 11.000 frt for an air separation plant from China to Texas, US. The scope of work included the shipment of the complete volume on one heavy lift vessel from Shanghai and Dalian to the port of Point Comfort in Texas. DAKO's Partner BNSF Logistics in the US arranged the off-loading from the vessel as well as the on-carriage of all components to the jobsite. The biggest challenge was the transportation of two components with the dimensions of about 60 x 7 x 10 m and 340 tons of weight as well as 15 x 10 x 20 m and 248 tons of weight.