Wind generating Plant for Pennsylvania / USA

DAKO WORLDWIDE TRANSPORT GMBH organized in cooperation with UTC OVERSEAS, INC., Atlanta, Georgia the transport of 25 wind generating units with a capacity of 2.5 MW each from ex factory Germany and Denmark via the ports of Bremerhaven, Esbjerg and Baltimore to the construction site near Johnstown, Pennsylvania where the erection of the towers took place in a new wind park.

DAKO and UTC OVERSEAS, INC. were responsible for delivery up to DDP construction site which included a tailor-made delivery schedule in accordance with the necessity of the erection.

The blades of the windmills had a length of 45 m which required very special preparation both for the precarriage in Denmark and Germany to the ports of loading as well as for the delivery from Baltimore to Johnstown.

The total quantity shipped from Europe was approx. 21.000 FRT.