Air Separation Plant For Brazil

DAKO WORLDWIDE TRANSPORT GMBH transported the heavy equipment for an air separation plant from Bremen to the port of Sepetiba in Brazil. The main items were cold boxes with unit weights of up to 200 tons and dimensions of 5420 x 545 x 535 cm. The heavy lifts were taken in Bremen from the construction place by floating cranes and loaded directly on board of the heavy lift carrier bound to South America. In Sepetiba, near Rio de Janeiro, the discharge of the cold boxes with a length of up to 5780 cm was directly effected onto modular trailers by ship`s gear.

These pieces have successfully reached their final destination in Santa Cruz, Brazil.