Wind Energy for Argentina

DAKO WORLDWIDE TRANSPORT recently started shipment for materials for a new wind energy plant for the Tres Picos project in the south of Argentina with shipments from ports in Spain and China to liner out Bahia Blanca Argentina - total about 55.000 FRT.

Nacelles and hubs were loaded in Sagunto / Spain for a quick trip to Bahia Blanca whereas total of 90 blades with a length of 64 meters each were loaded on two vessels in the port of Tianjin also for Bahia Blanca. The first lot of 45 blades which covered the whole deck of the MV "Chuang Xin" being on her maiden trip was in the meantime already unloaded in Bahia Blanca. The second lot was loaded on MS "Japin Arrow" for a last in / first out trip to Bahia Blanca and were unloaded in Bahia Blanca without any damage. Loading operations in Sagunto / Spain as well as in Tianjin / China were supervised by DAKO's specialists and the same for the organization of the complete unloading operation in Bahia Blanca.